Estimating: step-by-step videos

Create an estimate for a job, price it line by line and from your price library, then approve it to set the job's budget.

Set up a price library and add items

Make a supplier's library, add priced items with their cost codes, and lift the prices.

14 steps 1:26 video For estimators and admins

Before you start

  • Cost codes set up (Jobs & Job Cost videos), so each item can carry its code.
  1. 1

    Open Price Libraries

    Go to Settings > Price Libraries. Each library shows its type, location, supplier, how many items it holds, its effective date and whether it is active.

  2. 2

    Start a new library

    Click New Library.

  3. 3

    Name it and choose its type

    Internal is your own rates, Supplier is one vendor's catalogue, and Imported is a list you load from a file. This one is a supplier's, so pick Supplier.

  4. 4

    Where, who and from when

    Location is for rates that change by area, like Sunshine Coast against Brisbane. Supplier links the library to the vendor. Effective date is when this price list took effect.

  5. 5

    Create the library

    Click Create library. It opens, empty and ready for items.

  6. 6

    Add an item

    Click Add Item to price one line by hand. Import loads a whole price list at once (next video).

  7. 7

    Describe the item

    Description is what shows on the estimate. SKU is the supplier's item code, used to match items when you re-import. Unit is how it's priced. Primary cost type becomes the line's Type on an estimate.

  8. 8

    Give it a cost code

    The Cost code goes onto any estimate line you make from this item, so it lands in the right part of the budget.

  9. 9

    Enter the rates

    Five rates, all ex GST: Material, Labour, Subcontractor, Equipment and Other. Fill the ones the price covers. The item's total rate is their sum. Frames are supply only, so just Material.

  10. 10

    Order quantities and date

    Min order qty and Qty increment are for things sold in packs. Rate as at is the date the price was current; pickers show it beside the rate, so you can see how old a price is.

  11. 11

    Add the next item

    Add & add another saves the item and opens a blank form. Add the roof trusses the same way: code 6.04, $42.00 per m², then Add item.

  12. 12

    Your library

    Each item shows its unit, type, Total rate, the date it was As at, and where the price came from: typed in, imported or harvested from an invoice.

  13. 13

    Adjust prices

    Tick the items to change and click Adjust prices. Enter a percentage: 3 lifts every rate 3%, -2.5 drops them 2.5%. New rate as-at date defaults to today.

  14. 14

    Prices lifted

    Click Apply adjustment. Both rates are 3% higher and dated today. Estimate lines already priced from the library keep the rate they were given.

What happens next

Next, load a whole supplier price list from a file.

Import a supplier price list

Load a supplier's whole price list from a file, check it, and give the items you'll estimate with their cost codes.

11 steps 1:17 video For estimators and admins

Before you start

  • The supplier's price list as CSV, TSV, Excel or PDF, with a header row naming the columns.
  1. 1

    Make a library for the list

    Click New Library, name it, choose Supplier and link it to the vendor, then Create library.

  2. 2

    Start the import

    Click Import. It walks you through four steps: Upload, Match, Review and Import.

  3. 3

    Choose the file

    1. aA CSV, TSV, Excel or PDF file. A PDF is read with OCR, so a printed or scanned list works too; a long one shows its progress.
    2. bAdd new + update existing rates refreshes items you already have. Items match on SKU first, then description and unit, and a cost code you've set is never overwritten. Add new items only leaves existing items alone.
  4. 4

    Read the file

    Click Read file.

  5. 5

    Match the columns

    1. aEach column in the file is matched to a field, suggested from its heading. Change any that are wrong. Description and Unit are required, plus at least one rate.
    2. bThe prices include GST, so GST will be stripped: rates are always stored ex GST.
  6. 6

    Review the rows

    Click Review rows. The summary counts the rows to import and how many are flagged.

  7. 7

    Skip the notes row

    The first row is a note about the prices, not an item. Set Skip first to 1.

  8. 8

    Remove flagged rows

    A row with no unit or no usable price is flagged: here a section heading and a POA price. Remove all flagged rows drops them in one go, or use the × on a single row.

  9. 9

    Import

    Click Import. The result shows how many items were created, updated and skipped, and lists any row that didn't import.

  10. 10

    Your imported list

    Back on the library, every item is in, priced ex GST: the $24.75 sheet is now $22.50. Source shows they were imported.

  11. 11

    Give items a cost code

    A supplier's list has no cost codes. Click Edit on an item you'll use and pick its Cost code: Custom Orb sheet goes to 7.05. Do the same for the Quad gutter (7.03).

What happens next

Next, see how estimates are organised: Manage Estimates and the Estimating dashboard.

Manage Estimates and the Estimating dashboard: a tour

Where every estimate lives: the dashboard's summary and Manage Estimates, the list you work from. Nothing is saved.

13 steps 1:10 video For owners, estimators and project managers

Before you start

  • At least one job (Jobs & Job Cost videos).
  1. 1

    The Estimating dashboard

    Click Estimating in the sidebar. The tiles count your jobs and your estimates by status, with what they're worth: Draft is being priced, Submitted is with the client, Approved is won, Rejected is lost. Click a tile to see those estimates in Manage Estimates.

  2. 2

    The charts

    Estimates by status, their value, jobs by status and the average margin by status. Hover a slice or bar for its figure.

  3. 3

    Recent Estimates

    The estimates changed most recently. Click one to open its estimate sheet.

  4. 4

    Awaiting Decision

    Every estimate marked Submitted, the longest out first, with how long it's been out. The age turns amber after two weeks and red after a month, so you can see who to chase.

  5. 5

    Projects Needing Estimates

    Jobs without an estimate, newest first. Create opens the estimate sheet and makes the job's first estimate, called Initial Estimate, straight away. To name it yourself, or copy from another job's estimate, use New estimate in Manage Estimates.

  6. 6

    Open Manage Estimates

    Manage Estimates lists every job with its estimates. The Composite Library beside it holds the assemblies you reuse (see the composite videos).

  7. 7

    Find a job

    1. aSearch by job name, number, client or address.
    2. bShow only estimates in one state: Draft, Submitted, Approved, Rejected or Archived.
    3. cSort by recently updated, contract value, job name or job number.
  8. 8

    Filter by job status

    The chips filter by job status, with a count on each. The up and down arrow keys step through the list.

  9. 9

    A job's row

    1. aThe job, its number, client and site.
    2. bThe job's status, its latest estimate's status and version. v2 +1 means version 2, with one more version.
    3. cThe latest estimate's contract price and when it last changed.
  10. 10

    Versions and figures

    1. aVersion lists every estimate on the job with its status.
    2. bContract price (ex GST) and the margin as a percentage.
    3. cBuilder cost and gross margin in dollars.
    4. dHow many takeoff items, document sets and lines the estimate has.
  11. 11

    Open the work

    1. aOpen Estimate Sheet is where you price the job.
    2. bTakeoff opens the job's measured drawings; Specs opens the estimate's specification.
  12. 12

    Edit details and statuses

    The bin deletes a version; it only shows while the estimate has no budget. Close the dialog with Cancel.

    1. aEdit details on a Draft estimate.
    2. bThe statuses: Draft, Submitted, Approved, Rejected and Archived.
  13. 13

    An approved estimate

    1. aView Budget: approving made the job budget from this estimate.
    2. bUnlock to edit takes it back to Draft so it can change. See Un-approving.
    3. cOnly one estimate per job can be approved. Approving another one archives this one.

What happens next

Next, create the first estimate for a job.

Create an estimate

Start a job's first estimate in Manage Estimates, then open it and check the cost code set it prices with.

7 steps 0:32 video For estimators

Before you start

  • A job (Jobs & Job Cost videos) and a cost code set (Create a cost code set).
  1. 1

    Find the job

    1. aSearch: Nolan.
    2. bThe job. It has no estimates yet.
  2. 2

    Start a new estimate

    The panel says there are no estimates yet. Click New estimate. On a job that already has estimates, use New Estimate at the top of the page.

  3. 3

    Name it, leave it as Draft

    1. aThe job is already picked.
    2. bName: Initial Estimate.
    3. cStatus starts at Draft: it stays a draft while you price it.
  4. 4

    Copy from and separable portions

    1. aCopy from starts a revision from an earlier version of this job's estimate. A first estimate starts empty.
    2. bUse separable portions prices the job in stages, each with its own handover. It can only be switched on here, when the estimate is made (see Separable portions).
  5. 5

    Create it

    A message at the bottom of the page confirms it.

    1. aThe new version, v1, is a Draft.
  6. 6

    Open the sheet

    Open Estimate Sheet takes you to the grid where you price the job.

  7. 7

    Check the cost code set

    The cost code set decides which codes the sheet's dropdown offers. It starts at your default set, here Estimate Cost Codes. Pick another set if this job uses different codes; the sheet reloads with it.

What happens next

Next, put a line on the sheet for each trade the job needs.

Start an estimate from your cost codes

Put a line on the sheet for every trade the job needs in one go, grouped under your cost code headings.

8 steps 1:26 video For estimators

Before you start

  • An estimate (Create an estimate) and a cost code set with headings (Create a cost code set).
  1. 1

    Import Cost Codes

    An empty sheet. Estimates usually start from a takeoff (see the Takeoff guide), from your cost codes, or from a spreadsheet. This one starts from the cost codes.

  2. 2

    The set's codes

    1. aEvery code in the sheet's cost code set, with its unit. Headings aren't listed: they appear on the sheet as sections.
    2. bSearch by code or description. Select All ticks everything the search shows.
  3. 3

    Tick the trades

    Click a row to tick it. The count of selected codes shows at the bottom.

  4. 4

    Set the starting markup

    Default Markup % goes on every imported line. You can change it on any line later.

  5. 5

    Import them

    1. aA line for each code, with its description and unit. Quantity starts at 1 and the rate at 0, ready to price. Codes already on the sheet are skipped.
  6. 6

    Group them by heading

    1. aSections.
    2. bEach heading groups the codes under it, with the section's subtotal.
  7. 7

    Fold a section

    Click a section heading to fold or unfold it, so you can work on one trade at a time. Folding only changes your view.

  8. 8

    Save

    1. aSave. With Auto-save ticked, the sheet also saves itself as you work.
    2. bSaved, with the time.

What happens next

Next, a tour of the sheet: what each part of the header and toolbar does.

The estimate sheet, part 1: the header and toolbar

What the totals, markup, toolbar buttons and formula bar on the estimate sheet do. Nothing is saved.

13 steps 0:52 video For estimators

Before you start

  • An estimate with some lines on it (Start an estimate from your cost codes).
  1. 1

    The totals

    Cost (what the work costs you) plus Markup makes the Total, all ex GST. Contract Price is that total with GST: what the client pays.

  2. 2

    Estimate Markup %

    1. aType a markup and click Apply: every line takes it, and new lines start with it. It overwrites markups you've changed on single lines, so set it first. A 25% markup is a 20% margin.
  3. 3

    Add

    Add Line Item adds a blank line under the ticked one, or at the top. Add Composite Item builds an assembly of lines; Add Composite From Library reuses a saved one. Add From Price Library brings in priced items from your libraries.

  4. 4

    Delete Row and Import Cost Codes

    1. aDelete Row removes the ticked lines. They go for good when the sheet next saves.
    2. bImport Cost Codes adds a line for each code you tick.
  5. 5

    Templates

    Download template gives you a spreadsheet with the sheet's columns and dropdowns. Fill it in, or paste in your own pricing, then Upload estimate to add its lines.

  6. 6

    PDF

    Export PDF prints the estimate in detail or summed up by cost code, to download or save to the job's documents. Proposal PDF is the client's document: With breakdown for cost-plus work, Summary only for a fixed price.

  7. 7

    Issue to Client

    Sends the proposal into the client's portal if they have one, or a secure link by email if not. The PDF is frozen as it was when you sent it, and a Draft estimate is marked Submitted.

  8. 8

    Takeoff, Specification and RFQs

    1. aTakeoff opens the job's measured drawings. Once lines are linked to takeoff, a second button shows how many differ from the measurements and updates them.
    2. bSpecification makes or opens the estimate's specification, from each line's specification setting.
    3. cRFQs lists the requests for quote raised from this estimate.
  9. 9

    Cost code set

    The cost code dropdown offers this set's codes. On an estimate made with separable portions, Manage Portions and New Portion also show here.

  10. 10

    Sections and Auto-save

    1. aSections groups lines under their headings with subtotals.
    2. bAuto-save saves a moment after each change. Untick it and only Save saves; leaving with unsaved changes asks first.
  11. 11

    Save and Exit

    1. aWhether everything is saved, and when it last was.
    2. bSave saves now; Exit goes back to Manage Estimates.
  12. 12

    The formula bar

    Click a cell and fx shows what's in it. A cell with a formula is blue, and the bar shows the formula behind the figure.

  13. 13

    The formula guide

    Start with = and use any arithmetic. [quantity] reads this line's quantity; [quantity:+1] the next line's, [rate:-3] the rate three lines up, counting lines as the sheet shows them. End a formula with an operator, then click a cell to put its reference in.

What happens next

Next, part 2: the columns and the specification buttons.

The estimate sheet, part 2: the columns and specification buttons

What each column on the estimate sheet holds, and what Included, Excluded, Allowance and Note do to the price, the budget and the proposal. Nothing is saved.

10 steps 0:37 video For estimators

Before you start

  • A priced estimate. This tour uses an approved one, so every column has something in it.
  1. 1

    Tick and Item

    Tick a line to work on it; hold Shift or Ctrl to tick several. Item numbers the lines. A badge here means the rate came from a quote you applied (see the Purchasing guide).

  2. 2

    Specification

    IN is included scope: it's priced, goes into the budget and the proposal lists it as included. EX is an exclusion: it costs nothing and the proposal lists it as excluded. AL is an allowance: priced and budgeted, then settled against what the client actually chooses. NO is a note: it costs nothing and prints as a note.

  3. 3

    Allowances

    1. aPS, a provisional sum, covers supply and install; PC, a prime cost, covers supply only.
    2. bExcess is the margin on anything the client spends over the allowance. Leave it blank to use the line's markup. An under-spend goes back to the client in full.
  4. 4

    Cost Code and Description

    1. aCost Code: type a code or a word and pick from the list. Picking fills the description and unit when they're empty, and sets the Type from the code's default. Headings can't be picked.
    2. bDescription is what the line is. It prints on the PDFs and the specification.
  5. 5

    Calculation

    Type a formula starting with = and the result becomes the quantity, here four townhouses at 96 m² each. The cell shows the result; click it to see the formula.

  6. 6

    Quantity and Unit

    1. aQuantity: typed, from Calculation, or from takeoff.
    2. bUnit: m², lm, ea and so on.
  7. 7

    Rate and Amount

    1. aRate (ex GST) is what one unit costs you.
    2. bAmount (ex GST) is quantity times rate: your cost for the line, and what goes into the budget.
  8. 8

    Markup and Contract Price

    1. aMarkup % is this line's margin. It starts at the estimate markup; this one is lower.
    2. bContract Price is the amount plus markup, ex GST: what the client pays for the line.
  9. 9

    Type

    Material, Labour, Subcontractor, Equipment or Other. Put supply and install on separate lines when you want both.

  10. 10

    An approved estimate

    1. aThis estimate is approved: the toolbar says Approved (locked) and Save is greyed out.
    2. bNothing on a locked sheet can change: the buttons are greyed out and the cells are read-only. Unlock it in Manage Estimates to make a change.

What happens next

Next, price the lines on the sheet.

Price lines

Put quantities and rates on the lines: the estimate markup first, a calculation for the slab, a line that reads the one above it, and one line with its own markup.

6 steps 1:27 video For estimators

Before you start

  • Lines on the sheet (Start from your cost codes).
  1. 1

    Estimate markup first

    Estimate Markup % then Apply sets every line's markup and becomes the default for new lines. Do it before you change any line: Apply overwrites them.

  2. 2

    A calculation for the slab

    1. aThe concrete line, described as the ground slab.
    2. bCalculation: =14*14. Start with =, like a spreadsheet; the result, 196, goes into Quantity. The unit changes to m².
    3. cRate $142 and Type Subcontractor; Amount and Contract Price work themselves out.
  3. 3

    A line that reads the one above

    Tick the slab line and Add > Add Line Item. With Sections on, the new line sits at the top until it has a code; code 3.08 moves it under the slab and fills in the mesh. Its Calculation is =[quantity:-1]*1.1: the slab's area plus 10% for laps, 215.6 m². Click ? on the formula bar for the syntax. When the slab's quantity changes, this line follows.

    1. aThe mesh line's Calculation and the Quantity it works out.
    2. bClick the cell and the formula bar shows the formula behind the figure.
  4. 4

    Rates on three more lines

    Excavation 350 m³ at $38, ground floor wall frames 245 m² at $72, roof tiles 310 m² at $65, all Subcontractor. Amount and Contract Price work themselves out.

  5. 5

    One line's own markup

    Site establishment is priced at $18,500 and carries 10% instead of the estimate's 18%. Its Contract Price follows; the rest of the sheet keeps 18%.

  6. 6

    Save

    Cost plus Markup is the Total ex GST; Contract Price is the total inc GST.

What happens next

Next, say what each line is: included scope, an exclusion, an allowance or a note.

Specification status and allowances

Mark lines as excluded, note only, or an allowance (PC or PS) with its excess margin, and see where each status flows.

6 steps 1:08 video For estimators

Before you start

  • Priced lines (Price lines).
  1. 1

    Exclude a line

    Landscaping is by the owner. EX drops the line's amount to zero, but it stays on the sheet and the proposal lists it as an exclusion.

  2. 2

    A note

    Add a line, code 1.13, "Council and water authority fees paid by the owner", and click NO. A note costs nothing and prints on the proposal as a note.

  3. 3

    A prime cost allowance

    1. aFloor and wall tiles, supply only: 180 m² at $65.
    2. bAL makes it an allowance; PC, a prime cost, covers supply only. The client chooses the tiles later.
  4. 4

    A provisional sum

    Driveway and paths, supply and install, $18,000 as a lot. PS, a provisional sum, covers supply and install.

  5. 5

    The excess margin

    1. aExcess 15% on the tiles: the margin on anything the client spends over the allowance. An under-spend is credited in full.
    2. bLeft blank on the driveway, so it follows the line's Markup %.
  6. 6

    Save, and where it goes

    Included and allowance lines go into the budget; exclusions and notes don't. Allowances become the contract's allowance schedule and drive client selections, and the proposal prints each status in its own place.

What happens next

Next, build an assembly you can reuse: a composite.

Build a composite and save it to the library

Price an assembly once, per unit, and let its parts follow the quantity: a first floor internal wall per m², saved to the composite library.

6 steps 1:59 video For estimators

Before you start

  • A price library with a stud or frame item (Set up a price library).
  1. 1

    Start a composite

    1. aDescription: the assembly, here an internal stud wall for the first floor. Cost Code: the code the budget carries the whole wall under (6.02). Approval needs one.
    2. bQuantity 120, Unit m2 and Markup % 18: the composite is priced per m² of wall.
  2. 2

    Children per unit

    Base Qty is how much of each child goes into one m² of wall: studs 2.6 lm, plates 0.8 lm, plasterboard 2.0 m² (both sides) and 2.0 m² to fix and set (Labour). Each child has its own Cost Code, rate and type, so the budget splits it across framing and plastering. Picking a code fills an empty description and unit.

  3. 3

    A child that doesn't scale

    Delivery is one trip at $180 whatever the wall area. Tick Fixed and its quantity stays at 1 when the composite's quantity changes.

  4. 4

    A child from the price library

    From Price Library finds an item in your libraries: search MV-PT, tick the internal painting and set its Base Qty to 2, then Add as Child Items. It comes in with the library rate and type and keeps a link to the item. Its library code isn't one of this estimate's codes, so pick 14.01.

  5. 5

    Save it for next time

    Tick Add to Composite Library to keep the assembly for other estimates, then Create Composite. The composite sits at the top of the sheet with its children under it: each child's quantity is the composite's 120 m² times its base qty, and the delivery stays at 1.

  6. 6

    Change the quantity

    120 to 135 m²: every child scales, the Fixed delivery stays at 1. Then Save.

What happens next

Next, drop the saved wall onto another part of the job from the library.

Reuse a composite from the library

Add a saved assembly to the sheet with its own quantity, and see where saved composites are kept.

3 steps 0:29 video For estimators

Before you start

  • A composite saved to the library (Build a composite).
  1. 1

    Add Composite From Library

    Select Template lists every saved composite; search by name. Pick one and the preview shows its children with their codes, base quantities, rates and types.

  2. 2

    Use it, then set the quantity

    Use Template adds it at the quantity it was saved with. Change the composite's Quantity to 40 m² for the robes and linen walls and the children follow. Then Save.

  3. 3

    The composite library

    Estimating > Composite Library lists the saved templates. Open one to change its children or rates, or click New to build one without an estimate. Changes there don't touch composites already on estimates.

What happens next

Next, add supplier-priced lines straight from the price library.

Add lines from the price library

Search your libraries for priced items, set quantities and add them as lines with their code, rate and type.

6 steps 0:56 video For estimators

Before you start

  • Price libraries with items (Set up a price library, Import a supplier price list).
  1. 1

    Add From Price Library

    Save the sheet first: adding from the library refreshes it.

  2. 2

    Search

    1. aTwo characters or more. The search covers every active library.
    2. bEach item with its library, unit and rate ex GST.
  3. 3

    Tick and set quantities

    Quad gutter 85 lm and 90 mm downpipes 36 lm.

  4. 4

    Search again

    1. aCR-1030 finds the sarking: 6 rolls.
    2. bThree items selected across both searches.
  5. 5

    Add them

    The sheet reloads with the new lines.

  6. 6

    Where they land

    The gutter came with its library cost code, so it sits under Roofing with its rate and type. The downpipes and sarking have no code in the library, so they wait at the top of the sheet: pick 7.03 for the downpipes and they move into place beside the gutter. Do the same for the sarking (7.02). Rates are copied when you add them and each line keeps a link to its library item, so later price changes don't move it.

What happens next

Next, bring a schedule in from Excel.

Excel round trip

Download the sheet's Excel template, fill it in, and upload it as lines.

5 steps 0:28 video For estimators

Before you start

  • Lines on the sheet (any), and the filled sample file.
  1. 1

    Download the template

    An Excel file with the sheet's columns and dropdowns for Specification and Type. The Calculation column is text, so a formula like =24+30+18 stays as typed.

  2. 2

    The filled file

    Fill in one row per line in the template's columns, or paste your own pricing in. Here an electrician's schedule: a Calculation like =24+30+14 works out the quantity, a code the library doesn't know (10.07) is created on upload, and a row coded to a heading (10) comes in without a code.

  3. 3

    Upload estimate

    Upload estimate adds lines; it never replaces what is on the sheet.

  4. 4

    The result

    1. aWhat came in: lines added, rows skipped, codes created, and lines that need a code.
    2. bThe same in detail, with the codes: 10.07 was added to your library, and the line on heading 10 came in uncoded.
  5. 5

    Save

What happens next

Next, split an estimate into stages with separable portions.

Separable portions

Make a staged estimate, create its portions, assign lines to them and see where portions flow.

5 steps 1:19 video For estimators and project managers

Before you start

  • An estimate to copy (Create an estimate).
  1. 1

    A new estimate with portions

    Portions can only be switched on when an estimate is made. Copy from v1 so the lines come across. Four townhouses built in two stages is what portions are for.

  2. 2

    New Portion

    Name, Reference and Sequence; the description is optional.

  3. 3

    Assign lines

    Each line gets a stage in the Separable Portion column. Where a trade spans both stages, split it into a line per stage.

  4. 4

    Manage Portions

  5. 5

    Where portions flow

    Budget lines are kept per cost code and portion, the cost report groups by stage, and claims and PDFs can be run by portion.

What happens next

Next, the documents: the estimate PDF for you and the proposal for the client.

Estimate and proposal PDFs

Export the detailed estimate for your records and the proposal for the client, with or without the breakdown.

4 steps 0:58 video For estimators

Before you start

  • A priced estimate (Price lines).
  1. 1

    Export PDF

    Your internal copy, with rates and amounts. Saved, it goes to the job's documents under Estimating.

    1. aReport Type: Estimate Breakdown (Detailed) or Summary (By Cost Code/Trade).
    2. bInclude Heading Rows keeps the sections; Hide Markup shows marked-up rates for a client copy.
    3. cDownload, or Save to Project Documents to file it in the job's Estimating folder.
  2. 2

    Proposal with breakdown

    The client's document opens in a new tab: cover, your letter, then the investment overview by trade with GST and the total.

  3. 3

    Where the words come from

    Allowances and exclusions are listed from each line's specification status, and the breakdown by trade follows, each composite as one line under its code.

  4. 4

    Summary only

    The same proposal without the line breakdown, for a fixed-price quote.

What happens next

Next, send it: issue the proposal to the client.

Issue to the client and mark it Submitted

What Issue to Client sends, and how a Submitted estimate reaches the dashboard and the sales pipeline.

4 steps 0:40 video For estimators and owners

Before you start

  • A proposal you are happy with (Estimate and proposal PDFs).
  1. 1

    Issue to Client

    1. aRecipient: the job's client.
    2. bProposal Layout: Detailed Breakdown or Summary.
    3. cHide markup shows marked-up rates only; ticked by default.
  2. 2

    What issuing does

    A portal client sees the proposal in their portal; anyone else gets a secure email link. The PDF is frozen at the moment of issue, and a Draft is marked Submitted. This video stops here and cancels.

  3. 3

    Mark it Submitted by hand

    The same status, set from Manage Estimates. It puts the estimate on the dashboard's Awaiting decision and moves the client to Proposal in the CRM pipeline.

  4. 4

    Awaiting decision

What happens next

Next, the client comes back with changes: a new version from this one.

Revise: a new version from an earlier one

Start a revision by copying an earlier version, change it, and keep both.

3 steps 0:58 video For estimators

Before you start

  • A Submitted estimate (Issue to the client).
  1. 1

    New estimate, Copy from v1

    Copy from brings the lines, composites, document sets and takeoff across, with the markup and cost code set. Portions come across when ticked.

  2. 2

    Make the changes

    The client drops the scaffolding and upgrades the tiles: tick the line, Delete Row; tiles $65 to $85. Save.

  3. 3

    Both versions

What happens next

Next, approve the version the client accepts.

Approve and create the budget

Approve the accepted version: it locks, the budget is created from its builder cost, and the client moves on.

5 steps 0:39 video For estimators and project managers

Before you start

  • The version the client accepted (Revise).
  1. 1

    Check the totals

  2. 2

    Edit details, Approved

    Only one estimate per job can be approved: approving another one archives it. Every included or allowance line, and every composite, needs a cost code, or CortexPM lists the lines that are missing one and stops.

  3. 3

    Locked, with a budget

    1. aThe version is Approved.
    2. bView Budget: the budget was created from the builder cost. Markup stays out of it and is tracked as your margin.
  4. 4

    The budget

    Budget lines per cost code, from the estimate's builder cost.

  5. 5

    The client moves on

What happens next

Next, when something has to change after approval.

Un-approve to make a change

Unlock an approved estimate, change it, and re-approve so the budget follows.

3 steps 0:54 video For estimators and owners

Before you start

  • An approved estimate (Approve and create the budget).
  1. 1

    Unlock to edit

    1. aBack to Draft, so lines, details and specifications can change.
    2. bA budget exists: changing the estimate affects job cost figures until you re-approve.
  2. 2

    The head contract rule

    Once the job has a head contract, the estimate is frozen for everyone but the workspace Owner, who can override to correct a mistake. The contract value does not change.

  3. 3

    Change and re-approve

    Open the sheet, change the tile rate, Save, then Edit details > Approved. The budget is updated from the corrected estimate.

What happens next

From here the job runs on its budget: see Jobs & Job Cost, Purchasing and Contracts.